Title / site control
Documented clear title, ownership, or a signed option/purchase agreement giving control of the site — so a buyer knows the land can actually be acquired.
Definitions of site-certification due diligence terms, environmental assessments, geotechnical studies and utility will-serve letters.
Documented clear title, ownership, or a signed option/purchase agreement giving control of the site — so a buyer knows the land can actually be acquired.
A published asking price or a defined pricing methodology, so companies can evaluate cost up front rather than negotiate from scratch.
The site is already zoned for industrial/commercial use (or has a clear path to be), avoiding a lengthy rezoning process before construction.
The net buildable acreage remaining after setbacks, wetlands, easements, and other constraints is measured and documented.
A Phase I Environmental Site Assessment — a records and site review that identifies potential contamination risks (Recognized Environmental Conditions) before purchase.
A Phase II Environmental Site Assessment — sampling of soil and groundwater to confirm or rule out contamination flagged in a Phase I, with a No Further Action determination where possible.
A jurisdictional wetland delineation identifying regulated wetlands on the site, which can restrict where and how the site is developed.
A review for threatened and endangered species and habitat (often a Section 7 consultation), which can trigger permitting or mitigation requirements.
An assessment of FEMA flood-zone status, since floodplain acreage adds insurance, elevation, and permitting costs.
A cultural-resources or archaeological survey identifying historic or Native American sites that could delay or restrict development.
Soil borings and bearing-capacity testing that establish whether the ground can support the intended buildings without costly remediation.
An ALTA/boundary and topographic survey that precisely establishes property lines, easements, and grade for engineering and title purposes.
Documented electric service capacity available to (or extendable to) the site, a common gating factor for advanced manufacturing.
Documented potable/process water capacity serving the site.
Documented sanitary sewer or wastewater treatment capacity serving the site.
Documented natural gas availability and capacity at or near the site.
Documented broadband/fiber telecommunications availability to the site.
Formal 'will-serve' or capacity letters in which a utility commits, in writing, to provide a stated level of service to the site.
Whether utilities are built to the property line rather than merely available nearby — the difference between plug-and-play and an extension project.
Documented rail service to or adjacent to the site, where relevant to the target industries.
Documentation of road and interstate access — distance to highways and the adequacy of the connecting road network.
A documented local government resolution or commitment supporting development of the site.